A Trusted
Steam Specialist

Testimonials

Andrew worked with me on a turnkey hot water tank replacement managing the contractor in the demolition and installation of a new instantaneous hot water heater. The project proceeded smoothly and the system worked as promised. It has been in operation for a number of years now with no complaints.

Andrew has the products and knowledge I know I can trust.

Mark Gushulak Chief Operating Engineer

I have worked with Andrew for a number of years on many successful steam heating and condensate recovery projects in the Fraser Health Authority. I have found him to be an excellent resource on steam systems and he is always willing to share his knowledge. He presented a full day seminar on steam topics to our operating engineers which was well received. Andrew has participated in many BC CHES Trade Shows and has also been a guest speaker.

I would not hesitate to recommend Andrew to help you with any of your steam system requirements.

Chris Nicol Manager, Construction Commissioning & Inspection Lower Mainland Facilities Management
Did You Know?
Use Feedwater Economizers for Waste Heat Recovery

A feedwater economizer reduces steam boiler fuel requirements by transferring heat from the flue gas to incoming feedwater. Boiler flue gases are often rejected to the stack at temperatures more than 100°F to 150°F higher than the temperature of the generated steam. Generally, boiler efficiency can be increased by 1% for every 40°F reduction in flue gas temperature. By recovering waste heat, an economizer can often reduce fuel requirements by 5% to 10% and pay for itself in less than 2 years.

About Us

Client Testimonial

Andrew worked with me on a turnkey hot water tank replacement managing the contractor in the demolition and installation of a new instantaneous hot water heater. The project proceeded smoothly and the system worked as promised. It has been in operation for a number of years now with no complaints. Andrew has the products and knowledge I know I can trust.